Commissioning and Start-up
From factory acceptance testing to assisted start-up, with complete commissioning documentation.
Automation & Engineering
We run the electro-electronic commissioning of your project from paper to operation: acceptance testing, assisted energization, system start-up and knowledge transfer to the operations team.
What's included
- Factory (FAT) and site (SAT) acceptance testing
- Loop check and point-to-point testing
- Assisted energization and system start-up
- Commissioning data book and as-built documentation
- Operational support during the first production cycles
- Knowledge transfer to the local team

Commissioning and Start-up
Need this service in your operation?
Our team assesses the scope, builds the technical proposal and mobilizes at short notice. Talk to a specialist.
Request a proposalcomercial@hollinspec.com.brReady to raise the reliability of your operation?
Get in touch with our team of specialists and find out how Hollinspec can improve the safety, efficiency and compliance of your electrical installations.